Road bridge

Nibelungen Bridge

Germany Regensburg
Nibelungen Bridge
Nibelungen Bridge · Wikipedia

About

The Nibelungen Bridge (German: Nibelungenbrücke) is a dual road bridge with two sections spanning both arms of the Danube at kilometre mark 2378.39 in Regensburg, Germany. The current bridge, the third on the site, was erected in 2001–04 to replace a bridge erected in 1950 which was no longer adequate for traffic demands, and which had replaced a bridge built in 1938 and destroyed in World War II. Carrying an average of 42,000 vehicles a day, it is one of the most important bridges in the Regensburg area.

The 2004 Nibelungen Bridge has 6 lanes, two of them reserved exclusively for buses and taxis. It currently forms part of highways B8 and B15. With the Pfaffenstein Bridge and the Schwabelweis Bridge, it is one of only three Danube bridges without load restrictions. The bridge is also important in plans for tram service in Regensburg, as part of the "service axis". As another traffic improvement measure, before the bridge was rebuilt, the streets leading to it at each end were widened. Continuation of this street widening and construction of another bridge over the River Regen are planned, but are unlikely to occur soon.

The bridge consists of two sections of similar design over the two arms of the Danube on either side of the Lower Wöhrd, one of the two islands within the city. The southern bridge has a total span length of 168.9 m and also crosses a port railway line. The northern bridge is 206.9 m long. Both are continuous beam construction with three longitudinal sections and a primary span width of 90 m. On the south bridge, the two edge spans are each 39.45 m wide; on the north bridge, 58.45 m. Each bridge section has dual superstructures of 15.4 m width and 3.2 m constant height with a single-cell box girder of composite construction and a diagonally braced cantilevered concrete deck.

The bridge consists of two sections of similar design over the two arms of the Danube on either side of the Lower Wöhrd, one of the two islands within the city. The southern bridge has a total span length of 168.9 m and also crosses a port railway line. The northern bridge is 206.9 m long. Both are continuous beam construction with three longitudinal sections and a primary span width of 90 m. On the south bridge, the two edge spans are each 39.45 m wide; on the north bridge, 58.45 m. Each bridge section has dual superstructures of 15.4 m width and 3.2 m constant height with a single-cell box girder of composite construction and a diagonally braced cantilevered concrete deck.

Plans to supplement the Stone Bridge, at that time the only bridge across the Danube at Regensburg, with a new bridge go back to the late 19th century. The Stone Bridge was already overloaded by increased use (both city traffic and through traffic on two Imperial highways) but for unknown reasons the city hesitated. Meanwhile, several smaller bridges were built between the south bank of the river and the two islands (Upper and Lower Wöhrd) which lie within the city, but no additional bridge spanning the entire river. In 1926 a pontoon bridge was built between the Lower Wöhrd and the neighbourhood of Weichs, on the site of the north span of the Nibelungen Bridge. However, this alleviated the traffic problems only slightly because it could not be used by heavy vehicles.

Nibelungen Bridge

In 1930, definite planning began for a new Danube crossing which could carry heavy traffic. Three possibilities were considered:

- Extending the Iron Bridge (built in 1863) over the north arm of the Danube with a second span

- Constructing a new bridge at the Upper Wöhrd, supplementing or replacing a footbridge built there in 1901

- Constructing a new double-span bridge to extend Weißenburgstraße to Weichs (what became the Nibelungen Bridge) Firm plans for a new steel bridge were made in 1933. Architect Roderich Fick, suggested by the Bavarian Ministry of the Interior, was engaged to oversee architectural design and the Munich engineering firm of Gerhard & Zenns the structural design. A traffic count on the Stone Bridge on a Saturday in early 1934 counted 40,000 pedestrians, 14,500 cyclists, 5,500 vehicles of all kinds and 278 trams. The city therefore decided to bypass the Old City on the east, to build a new bridge over the River Regen (the Frankenbrücke ), and to fund both. In summer the cost of constructing both was estimated at almost ℛℳ 5.05 million, which led to a dispute between the city, the state of Bavaria and the Reichswehr, which was intensely interested in the Danube bridge. In summer 1935 it was agreed that costs would be shared between the Reich, the city, Bavaria and the Reichswehr, and preparations for construction began.

The bridge was named the Adolf Hitler Bridge and at the groundbreaking on 21 December 1935, the Bavarian Minister for the Interior, Adolf Wagner, dedicated it "to the glory of the state, the glory of the Bavarian Ostmark and the glory of National Socialist Germany". Work began with the north span, between the Lower Wöhrd and Weichs; work on the south span, between Weißenburgstraße and the Lower Wöhrd, began in summer 1936. In 1937 the north span opened to traffic and repairs immediately began on the Stone Bridge. On 18 June 1938, the south span and the Frankenbrücke both opened, and on 16 July Minister Wagner ceremonially christened the bridge. Several thousand people attended the festivities and the fireworks that evening.

Nibelungen Bridge

The bridge was designed by Roderich Fick, with engineering work by Gerhart & Zenns. Fick wanted the new concrete bridge to appear as slender and serene as possible to contrast with the Stone Bridge.

On 23 April 1945, the bridge was blown up to slow the Allied advance, and largely destroyed.

Immediately after the end of the war, work began on clearing rubble and establishing ferry service between Weichs and the Lower Wöhrd to carry traffic; a pontoon bridge was later put in place. In 1950 a replacement bridge, only slightly changed from Fick's design, was opened to traffic and named the Nibelungen Bridge. In 1964 the city expanded the bridge from 2 to 4 lanes by eliminating the pedestrian and bicycle lanes. In 1997 this gradually proved to be a problem, since that year the Stone Bridge was closed to private traffic and thus the Nibelungen Bridge had to accommodate almost 50,000 vehicles per day. Increasing damage to the steel structure required heavy freight to avoid the bridge. Repairs were thus not worthwhile, so planning for a new bridge began in 2001.

Construction of the third bridge (2001–04)

On 3 March 2001, the foundation stone for the new Nibelungen Bridge was laid by the Lord Mayor of Regensburg, Hans Schaidinger, and the Bavarian Interior Minister, Günther Beckstein. The old bridge first had to be moved 8 m laterally so that traffic could continue to use it. Use of the bridge by traffic continued without further restrictions until July, when the eastbound lanes had to be closed for 4 weeks while the bridge pillars were extended 10 m and rails installed in preparation for shifting the old bridge. Buses were nonetheless able to continue to use the northern half of the bridge except on the moving day itself. Moving began on 8 August; on 30 August 2001, the entire length of the bridge reopened after the move.

Nibelungen Bridge

Work began on the new western spans in August 2001 and was completed on 9 November 2002. Traffic was then redirected across the new half, and the old bridge was for the most part demolished or exploded. After all the rubble was cleared, construction of the eastern spans began and was completed in April 2004. After the bridge was fully open to traffic, final tasks consisted of making permanent roadway markings and constructing pedestrian and bicycle paths on the west side; during construction there had not been space for these. All construction was complete in mid-June 2004.

The cost of the bridge was increased by at least DM 7.6 million by the need to acquire more steel because of a data entry error combined with underestimation.

Plans to supplement the Stone Bridge, at that time the only bridge across the Danube at Regensburg, with a new bridge go back to the late 19th century. The Stone Bridge was already overloaded by increased use (both city traffic and through traffic on two Imperial highways) but for unknown reasons the city hesitated. Meanwhile, several smaller bridges were built between the south bank of the river and the two islands (Upper and Lower Wöhrd) which lie within the city, but no additional bridge spanning the entire river. In 1926 a pontoon bridge was built between the Lower Wöhrd and the neighbourhood of Weichs, on the site of the north span of the Nibelungen Bridge. However, this alleviated the traffic problems only slightly because it could not be used by heavy vehicles.

In 1930, definite planning began for a new Danube crossing which could carry heavy traffic. Three possibilities were considered:

- Extending the Iron Bridge (built in 1863) over the north arm of the Danube with a second span