Stadium

BC Place

Canada Vancouver
BC Place
BC Place · Wikipedia

About

BC Place is a multi-purpose stadium in Vancouver, British Columbia, Canada. Located at the north side of False Creek, it is owned and operated by the BC Pavilion Corporation (PavCo), a Crown corporation of the province. The venue is currently the home of the BC Lions of the Canadian Football League (CFL), Vancouver Whitecaps FC of Major League Soccer (MLS), the annual Canada Sevens (part of the World Rugby Sevens Series), as well as the BC Sports Hall of Fame. Opened on June 19, 1983, BC Place was originally an indoor structure with an air-supported roof, the world's largest at the time. Following the 2010 Winter Olympics, it was closed for 16 months as part of an extensive revitalization, the centrepiece of which was replacing the inflatable roof with a retractable roof supported by cables. Once construction was completed, the stadium's new roof was also the largest of its type. BC Place was the main stadium for the 2010 Winter Olympics and 2010 Winter Paralympics, the 2012 CONCACAF Women's Olympic Qualifying Tournament, as well as a venue for multiple matches including the championship match for the 2015 FIFA Women's World Cup. The stadium is set to host multiple matches during the...

Construction of the stadium started in February of 1981, with Dillingham Construction contracted to build the stadium, designed by architecture firm Studio Phillips Barratt, Ltd. BC Place was built as part of the preparations for the 1986 World's Fair, Expo 86. Upon its completion in 1983, the stadium, designed by structural engineers Geiger Berger Associates, was the world's largest air-supported domed stadium until May 4, 2010, when it was deflated for the last time in preparation for the erection of its new retractable roof. Its original air-supported design was similar to the Hubert H. Humphrey Metrodome in Minneapolis, Minnesota, which later stored pieces of the roof for reuse.

The stadium held its grand opening on June 19, 1983. The first major event held in the stadium came the next day, June 20, when the Vancouver Whitecaps hosted the Seattle Sounders in a Monday night North American Soccer League (NASL) game with attendance announced at 60,342. On June 23, 1983, the BC Lions played their first game at the new stadium, a preseason 41–19 victory against the Calgary Stampeders with 53,472 in attendance. A month later, on July 24, 1983, a crowd of 41,810 watched the BC Lions defeat the Saskatchewan Roughriders 44–28 in the Lions' first regular season game at the stadium. The venue would host the Soccer Bowl '83 and the 1983 Grey Cup game later that year. On September 18, 1984, Pope John Paul II addressed an over-capacity crowd of 60,000 for "A Celebration of Life". The celebration was part of the papal visit to the Archdiocese of Vancouver. It was one of the most heavily attended events in the stadium. The Pope's Celebration of Life was followed a few months later by the Billy Graham Crusade, which drew similar numbers [ citation needed ] for eight nights.

The stadium was then used for the opening and closing ceremonies of the 1986 World Exposition on Transportation and Communication ( Expo '86 ). Accepting an invitation by the Province of British Columbia, the Prince and Princess of Wales presided over the opening ceremonies of the World's Fair on May 2, 1986. In 1987, an exhibition match of Australian rules football was played at the stadium and drew a crowd of 32,789 – a record for the largest AFL /VFL crowd outside of Australia. [ citation needed ] The stadium also hosted a National Football League exhibition game in 1998 when the San Francisco 49ers defeated the Seattle Seahawks 24–21 in the American Bowl with 45,000 in attendance.

On January 5, 2007, snow accumulated on the air-supported Teflon Fibreglass roof, despite strict zero accumulation of ice guidelines and ice accumulation structural warnings. The accumulation caused a tear in the roof's ETFE -coated fabric close to Gate G on the south side where the roof meets the top of the concrete bowl. The tear grew quickly as air escaped through it, whereupon maintenance staff performed an intentional, controlled deflation to protect the integrity of the roof's intact fabric panels. As it was designed to do, the deflated roof rested on its steel support cables 6 metres (20 ft) above the seating and the field. Normally, the roof had a rise of 27 metres (90 ft) above the top of the bowl when inflated. No one was injured during the incident, although rain and melted snow flooded the bowl and subsequently had to be pumped out.

BC Place

An independent report indicated that an accidental rapid pressurization combined with lightly gusting wind and a location of previously undetected damage caused the tear. The damaged panel was replaced with a temporary one on January 19 and the roof was re-inflated. The BC Contractors Association held an exhibition in the stadium over the week of January 23, during which the roof leaked in several places when it rained. The temporary panel was successfully replaced with a permanent one in June 2007, just prior to the start of the 2007 CFL season.

On May 16, 2008, it was announced that over $150 million in major renovations would be carried out on BC Place Stadium. The work was done in two phases. The first phase involved upgrades to seating, washrooms, concessions, and luxury suites, as well as the reinforcement of the existing ring beam at the top of the building and was completed in October 2009, in time for the 2010 Winter Olympics.

Work on the retractable roof began in May 2010, with PCL Westcoast Constructors Inc. contracted to construct the roof designed by architecture firm Stantec Architecture Ltd. and structural engineering firm Geiger Engineers, with Schlaich Bergermann & Partner serving as consulting engineers and Genivar, Inc. acting as services engineers. Geiger also designed the stadium's new centre-hung scoreboard. The roof's construction began immediately after the completion of the 2010 Winter Paralympics and the final deflation of the air-supported roof. The official budget for the completed Phase 1 upgrades plus the revitalization project was $514 million. The new roof, a cable-supported retractable roof system first used with the Commerzbank-Arena in Frankfurt, Germany, is the largest of its kind. The opening measures 100 by 85 metres (109 by 93 yd), the same size as the field below. The fabric roof retracts into and is hidden by a pod in the centre of the opening, above the suspended videoboard.

The updated stadium also features the second largest centre-hung high definition scoreboard in North America, after the one in AT&T Stadium. In addition, a new artificial turf developed by Polytan was installed at an estimated cost of $1.2 million. It is designed to achieve FIFA 2-star certification, the highest rating possible. The soccer pitch is 117 by 75 yards (107 by 69 m).

TSN analyst and former CFL player Chris Schultz praised both the design and engineering of the new stadium. Columnist Brian Hutchinson has praised the renovations for significantly improving the acoustics, and providing a bright and airy feel to the stadium. These were aspects that were missing in its previous air-supported roof incarnation, as well as the Montreal Olympic Stadium and the Rogers Centre (formerly SkyDome ).

BC Place

The artificial turf installed between September 2011 and April 2015 drew criticism, notably its lacklustre characteristics for playing professional level soccer. A new artificial turf was installed in May 2015, prior to the FIFA Women's World Cup Canada 2015. The total cost of the turf upgrade was $1.327 million, with Canada Soccer and Rugby Canada contributing $500,000 CDN to the project. Liam Middleton, Canada's Rugby Sevens coach, stated that the new surface was "better than some natural grass surfaces they've played on."

- New retractable roof is the largest cable supported retractable roof in the world.

- Revolving doors replaced with clear glass doors, which allows the stadium to be accessed much more easily.

- Old brown glass around building replaced with light green glass which lets more light in and makes stadium brighter.

- BC Lions locker room completely expanded and refurbished: Old lockers were taken out, sanded down, refinished, and put back in. New cubicles were also put in with individual lighting for players. Locker room also sports a new floor called "sport floor".

BC Place

- New synthetic turf, called Polytan LigaTurf RS+, was installed as the new playing surface. Turf has a 1 + 1 ⁄ 4 inches (32 mm) thick shock pad underneath the turf and special eco-friendly BionPro infill.

- Around the stadium is a new 51 inches (1.3 m) electronic ribbon board, with a circumference of 2,200 feet (670 m).

- Added 1,140 new HDTV screens. Screens work through a system called Stadium Vision. Each screen runs on a separate video source, allowing menu boards at concourse concession stands to show game updates to fans as they order from concession stands.

- Added 140 additional portable concession stands. Storage of food and supplies will be in concession stands.

- 50 fully refurbished private suites and 1,300 newly refurbished premium Club Seats.